Micas Networks Broadcom
Events · SC26 Chicago

Own Your Network: Micas and Broadcom Bring 102.4T Co-Packaged Optics to SC26

Join us in the Broadcom booth (#4626) on Thursday, November 19, at 11:00 a.m. CT to see how Tomahawk 6 – Davisson CPO cuts optical power on an open network you control.

See the session details
Home News Micas and Broadcom at SC26
102.4T
CPO switching in 1RU
~70%
Less optical power vs. pluggables (Broadcom)
#4626
Broadcom booth · Nov 19 · 11 a.m.

At SC26 in Chicago, Micas Networks will join Broadcom in its booth to show how co-packaged optics (CPO) can cut the power cost of scaling AI and HPC fabrics, on an open network you control from the hardware up.

Our focus is the new Micas 1RU Tomahawk 6 – Davisson platform: 102.4 Tb/s of switching with the optics built into the switch package, running SONiC, with production scheduled for Q1 2027. It’s the newest step in a CPO partnership with Broadcom that spans multiple generations.

Power is now the limit on scale

For many research centers and AI operators, the constraint on cluster growth is no longer floor space. It’s power. Every watt spent moving data between accelerators is a watt not available for compute, and at 800G and 1.6T, pluggable optical transceivers account for a large and growing share of network power.

Co-packaged optics attacks that problem directly. By placing silicon photonics engines in the same package as the switch chip, CPO removes much of the high-speed electrical path to front-panel modules. Broadcom reports that Tomahawk 6 – Davisson reduces optical interconnect power by roughly 70% compared with traditional pluggable optics.

Illustrative, based on Broadcom’s reported ~70% reduction in optical interconnect power.

For SC attendees balancing ambitious science against fixed facility power, that’s capacity handed back to compute.

Inside the Micas Davisson platform

Front panel of the Micas M2-W6950-64X3-DR8-CP 1RU Tomahawk 6 - Davisson co-packaged optics switch with MMC DR8 optical connectors.
Co-packaged optics · 1RU
Micas Tomahawk 6 – Davisson CPO switch
M2-W6950-64X3-DR8-CP08-DC
Switch silicon
Broadcom Tomahawk 6 – Davisson, third-generation CPO
Capacity
102.4 Tb/s
Interfaces
64 x 1.6T MMC DR8 optical
Optics
16 x 6.4T co-packaged silicon photonics engines
SerDes
200G per channel
Serviceability
Field-replaceable ELSFP laser modules
Network OS
SONiC
Production
Q1 2027

The field-replaceable external lasers matter. They answer the most common operator question about CPO, what happens when an optical component needs service, while keeping the power benefits of integration.

For sites not yet ready for CPO, Micas offers the same 102.4T Tomahawk 6 generation as a 4RU air-cooled 128 x 800G system and a 2RU liquid-cooled 64 x 1.6T system, both scheduled for production in Q4 2026. All three run the same SONiC software, so moving to CPO doesn’t mean changing how you operate. See the full Tomahawk 6 lineup.

Own your network, own your stack

AI and HPC networks have drifted toward closed, vertically integrated systems in which one vendor supplies the switch, optics, NIC and software, and sets the roadmap. Micas takes the opposite approach.

  • Open software. Every Micas platform runs SONiC, so operators control their own automation, telemetry and feature roadmap instead of waiting on a vendor’s release cycle.
  • Open compute choices. Broadcom Tomahawk 6 is standards-based Ethernet that works with any NIC or accelerator, so research centers can mix vendors on one fabric.
  • Your path, your pace. Air-cooled, liquid-cooled or co-packaged; 800G or 1.6T. Operators choose based on their facility and timeline.
  • A supply chain you can see. Micas owns and operates its manufacturing facility in Malaysia.
“AI infrastructure operators should be able to choose how they build, scale, and operate their networks. By bringing Broadcom Tomahawk 6 pluggable and Davisson CPO systems into one portfolio, Micas is providing a practical path from 800G to 1.6T while preserving the openness customers need.”Andrew Qu · CEO, Micas Networks

Proven CPO, built with Broadcom

CPO is no longer experimental. Micas began building CPO systems in 2023 and was the first system vendor to commercialize a switch on Broadcom’s 51.2T Tomahawk 5 – Bailly CPO platform, now in volume production. Davisson doubles that bandwidth, and Broadcom is already developing a fourth-generation CPO solution targeting 400G per channel.

Shipping now
Tomahawk 5 – Bailly
51.2T

First CPO switch Micas brought to volume production.

Q1 2027
Tomahawk 6 – Davisson
102.4T

Micas 1RU platform, 200G per channel, on show at SC26.

In development
Broadcom 4th-gen CPO
400G / channel

A long-term roadmap on Broadcom Ethernet.

“Co-packaged optics will play an increasingly important role as AI networks move to higher bandwidth and greater scale. Micas has built valuable system-level experience commercializing CPO, beginning with Tomahawk 5-Bailly and now extending to Tomahawk 6-Davisson.”Manish Mehta · VP Marketing & Operations, Optical Systems Division, Broadcom

Join us at SC26

SC26 runs November 15 to 20 at McCormick Place in Chicago, with the exhibit floor open November 17 to 19. Stop by the Broadcom booth to hear our session and see how CPO and an open stack fit into your next fabric. Everyone who visits the booth and attends the session is entered into our daily raffle for Apple AirPods Max.

Nov 19
Thursday11:00 a.m. CT
Rajan Kumar
SpeakerSoftware Engineering Director, Micas Networks
#4626
Broadcom boothMcCormick Place, Chicago
Session Own Your Network: Scaling AI and HPC Fabrics with 102.4T Co-Packaged Optics

Power, not floor space, now limits how far AI and HPC clusters can grow. Rajan Kumar introduces the new 1RU Micas Tomahawk 6 – Davisson platform, built on Broadcom’s third-generation co-packaged optics, and shows how running it on open SONiC lets operators own their network stack instead of renting someone else’s roadmap.

Frequently asked questions

Where and when is the Micas session at SC26?
In the Broadcom booth, #4626, at McCormick Place in Chicago on Thursday, November 19. The session starts at 11:00 a.m. CT.
When does the Davisson CPO switch ship?
Production of the 1RU Micas Tomahawk 6 – Davisson platform is scheduled for Q1 2027. The 4RU 800G air-cooled and 2RU 1.6T liquid-cooled systems start production in Q4 2026.
How much power does CPO save?
Broadcom reports that Tomahawk 6 – Davisson reduces optical interconnect power by roughly 70% compared with traditional pluggable optics. Savings for a full system depend on your fabric design.
Can I service a CPO switch in the field?
Yes. Davisson uses field-replaceable ELSFP external laser modules, so the most common optical service task doesn’t require replacing the switch.
Do I need to change software to move to CPO?
No. All three Micas Tomahawk 6 platforms run SONiC, so you keep the same automation and operations as you move from pluggables to CPO.

Meet us in Chicago

Book time with our team at SC26 to talk about CPO, power and owning your stack, from 800G pluggables to 102.4T co-packaged optics.

Related1 Million Hours, Zero Link Failures: What Meta’s CPO Test Means for AI Networks →
Sources: Broadcom, “Broadcom Announces Tomahawk 6 – Davisson,” October 2025; StorageReview, “Broadcom Ships Tomahawk 6-Davisson CPO Ethernet Switch”; StorageReview, “Micas Networks Tomahawk 6 102T Switches with Davisson CPO,” October 2026. Power figures are as reported by Broadcom.